Installing Batteries
The APM 150 uses three (3) AA size non-
rechargeable batteries. The unit is shipped with
batteries not installed. You will find the batteries
in the instrument package.
Figure 1—Front view
To install the batteries:
!
Loosen the battery cover screw on the front of
the instrument.
!
Slide the cover left and lift it out (Fig. 1).
!
Install the batteries over the pull strap, taking
care to observe each battery's polarity.
!
Replace the cover and tighten the screw.
Note: When the batteries become low, the LCD
will show [
] above the reading. From
that point, you will have about one hour of normal
use left. If [
] comes on continuously and
replaces the reading, the battery voltage is too low
for accurate measurements and the meter will turn
itself off.
Always keep a replacement set of new batteries
available.
Preparing the Instrument
The meter is shipped with its auto shut-off feature
enabled. This setting will automatically turn the
unit off after a twenty-minute period of keypad
inactivity. To disable this feature, follow the
instructions in the menu selections (see page 11).
Before removing any parts from the carrying case,
the arrangement of the various items should be
noted so that repacking can be done easily. See
Figures 2 and 3.
3
GETTING STARTED
If your instrument is equipped with more than one
hood, the frame channels needed to support other
sizes are stored under the base of the Electronic
Balometer inside the accessory case. The extra
hoods are stored around the Electronic Balometer
base.
Figure 2—Top view of carry case
Figure 3—Unpacking accessory case
Hood Attachment
Step 1: Remove the tie down straps at the two
Step 2: Holding the 2 ft x 2 ft (600 x 600 mm)
locations shown in Figure 2.
hood frame, gently lift the entire
instrument assembly and set it to the side
of the carrying case.
3