Conditions For Correct Installation Of Shelves; Installation Of The Base Unit; Initial Phase - Garant 94 6021 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

4.2.

Conditions for correct installation of shelves

Sufficient loading capacity of the ground.
Ready-to-install foundation / screed.
Ensure the ground anchors are stable:
Strength of concrete floor should be at least 180 mm
(Minimum 200 mm from the edge)
Resistance of the concrete should be at least B25, with the top layer 35
mm thick.
Important note
All upright frames of the shelves must be secured using the ground anchors
supplied.
4.3.

Installation of the base unit

4.3.1

Initial phase

Insert mounting hooks (a) into the top and bottom holes (c), only screw
screws (M6) (b) in by a few convolutions.
On the bottom drawer runners (e, f ), remove the plastic lock (d) and
disassemble the runners.
This will make it easy to insert the baseframe.
www.hoffmann-group.com
DE
EN
FR
IT
ES
33

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

94 04194 607394 608394 601194 603194 6051 ... Mostrar todo

Tabla de contenido