Electrical Connection; Maintenance Programme - hafele 941.15.000 Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 25
4.

ELECTRICAL CONNECTION

EN
Electrical connections and start-up are shown in the installation
manual of Control Panel EL16 or 192C.
5.

MAINTENANCE PROGRAMME

(Manufacturer's specifications: every 6 months)
Power off 230 V~ and batteries:
-
Clean and lubricate the moving components (especially the
rollers and the running gear).
-
Check the tension of the belt.
-
Clean sensors and light barriers.
-
Check for the stability of the automatism and check that all the
screws are tightened all the way.
-
Check that the wings are correctly aligned, that stops are
properly positioned and that the lock has been correctly fitted.
Power on 230 V~ and batteries:
-
Check that the lock is working properly.
-
Check for the stability of the door and that the movement is
steady, without friction.
-
Check the operation of all command functions.
-
Check the functioning of the light barriers.
-
Check that the forces generated by the door comply with
legal requirements.
-
Check the batteries functioning.
ATTENTION: For spare parts, see the spares price list
16/44

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

941.15.001941.15.002941.15.003

Tabla de contenido