1.7
Compactation
The maximun depth to compact depends of the earth type and its composition, as granulometry,
water content etc., then it should made probes for each earth type.
For compactation in inclination places, are advised not to exceed 30% and take precautions to avoid
any mishaps.
For the lateral inclination, not surpass under any concept the maximum allowed 20º, due to exist
overturn danger.
1.8
Maintenance
MAINTENANCE WORKS
First exciter´s oil replacement
Check engine´s oil
Engine´s oil replacement
Check the V-belt
Check fixation screws
Clean spark plug and check electrode 0,7mm
Clean engine´s air filter
Check bearing condition of the box
ENGLISH
MAINTENANCE SCHEDULE
OPERARATION
INTERVAL
After 30 hours
Daily
150 hours
monthly
monthly
monthly
150 hours
150 hours
1B
1B-6