WARNING! To reduce the risk of ignition of a flammable explosive atmosphere,
batteries MUST be changed ONLY in a location known to be non-hazardous.
WARNING! To reduce the risk of explosion DO NOT mix old batteries with new
batteries, or mix batteries of different manufacturers.
WARNING! Batteries may ONLY be replaced with the following:
Duracell MN1500
Duracell MX1500
Energizer E91
Meter Chamber Assembly
Figure 2
IMPORTANT! If replacing any components of the meter chamber, the
complete assembly must be replaced due to its precision method of
construction. This will assure a proper fit, and correct operation of the
chamber.
Repair
Meters needing repairs should be taken to an authorized repair facility. Meters MUST be
triple rinsed before taking them in for repairs.
IMPORTANT! When returning a meter for service, it must be triple rinsed and
accompanied by a note stating what chemicals have been pumped through it.
Meters not adhering to these specifications may be refused for service.
Safety Testing Approvals
The Fill-Rite 900DB series meters have been tested for compliance to the standards set
forth by Underwriters Laboratories (UL), UL Canada, ATEX, and other testing
organizations. To determine which specific compliances apply to your particular
meter, refer to the faceplate for information and compliance logos.
The Meter Chamber consists of upper and lower chambers, a
nutating disc, and four screws (figure 2).
1) To expose the meter chamber assembly and seal remove
the 4 screws.
2) The meter chamber can be dislodged by removing the 4
screws (see figure 2).
Reassemble by reversing this procedure.
8