Installation Instructions; Step 1 - Unpack Beverage Center; Remove Packaging - Haier HEBF100BXS Manual Del Usuario

Centro de la bebida
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS

STEP 1 - UNPACK BEVERAGE CENTER

Do not puncture refrigerant tubing.
Follow handling instructions carefully.
Flammable refrigerant used.
Failure to do so can result in death, explosion or fire.
IMPORTANT: Handle with care when moving beverage center to avoid
either damaging the refrigerant tubing or increasing the risk of a leak.
IMPORTANT: When moving the beverage center, never tilt it more than
a 45° angle. This could damage the compressor and the sealed system. If
the beverage center has been placed in a horizontal position for any period
of time, wait 4 hours before plugging in the beverage center to allow the
refrigerant to settle.

REMOVE PACKAGING

Remove tape and glue residue from surfaces before turning on the
beverage center. Rub a small amount of liquid dish soap over the adhesive
with your fingers. Wipe with warm water and dry.
NOTE: Do not use sharp instruments, rubbing alcohol, flammable fluids,
or abrasive cleaners to remove tape or glue. These products can damage
the surface of your beverage center. For more information, see "Beverage
Center Safety."
Dispose of/recycle all packaging materials.
CLEAN BEFORE USING
After you remove all of the packaging materials, clean the inside of the
beverage center before using it. See the cleaning instructions in "Beverage
Center Care."
49-60809 Rev. 2
WARNING
FIRE OR EXPLOSION HAZARD
9

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido