Interface; Assembly Of Spray Guard And Cover Accessories - Ilmvac ROdist basic Serie Instrucciones De Manejo

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Interface

Data transfer via IR interface
The heating bath transfers data via IR interfaces. These are loca-
ted on the left display side of the heating bath or on the right side
of the drive unit. Do not place any objects between the two ope-
rating units as otherwise the data transfer may be interrupted (fig.
14)!
Remote Mode
Using the laboratory device software "labworldsoft" and the rota-
ty evaporator ROdist digital the device can be operated in
"Remote" mode. In this mode, the device can no longer be hand-
operated.
„ LCD display see fig. 10
Note: Please note the system requirements as well as the opera-
ting instructions and help section included with the software.
2009-03-18

Assembly of spray guard and cover accessories

Assembly spray guard HB 10.1
☞ Assemble the spray guard as illustrated.
- Place the bracket of the spray guard on
the front edge of the heating bath.
- Attach the spray guard by tightening the
screws using a screwdriver.
Fig.14
Assembly Cover HB 10.2
☞ Assemble spray guard and cover as illust-
rated.
- Push the angled sheet on the back part of
the cover into the guide rails at the rear of
the heating bath.
- Screw the back and front part of the
cover to the spray guard.
Fig.15
Fig.16
Fig.17
21

Publicidad

Tabla de contenido
loading

Tabla de contenido