1.10 ADVANCED SUPPLEMENTARY GENERATOR CONTROL (REFERENCE TEMPERATURE ON THE SYSTEM INERTIAL STORAGE TANK)
In addition to standard control, as described in the installation and operating manual, it is possible to subordinate supplementary generator start-up
(F-L terminals on the PCB-TERMINAL BLOCK) to system inertial storage temperature, installed between the generator (PdC and supplementary
generator) and the user systems (fancoil system, radiant system, DHW).
1.
Disconnect connector "In. W. S."
2.
NOTE: Maximum length of 30m.
3.
Set parameter 110=2.
one installed on ELECTA delivery, but only during heating function, not during DHW.
To start the supplementary generator, THE compressor frequency needs to have a value other than zero. Accordingly, as soon as the temperature in
NOTE:
•
With DHW, standard control applies.
•
System inertial storage is a tank relative to the system and must NOT be confused with the storage of domestic hot water.
Enclosed documents
Fig. 8: Reference probe connection on the system inertial storage tank
303
EN