Pentair MYERS MSC133 Manual Del Usuario página 4

Bomba sumergibles para sumideros
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
3. Place the pump in the sump; make sure that
nothing interferes with switch operation. For
tethered switch models, the tether length
should be 3-1/2" (See Figure 3).
Figure 3
4. Finish installing the necessary plumbing.
Follow the glue manufacturer's instructions for
safety precautions and curing time.
Figure 4
Risk of flooding. Make sure the pump
cannot move in the sump. If the pump moves
when it runs, the piping or sump wall may
interfere with the switch and prevent the pump
from starting or stopping.
6201 0410
6202 0410
6204 0716
For parts or assistance, call Customer Service at 1-888-987-8677
Figure 5
5. Power Supply: This pump requires a 115 V.,
60 Hz., 15 amp individual branch circuit.
The circuit must be grounded and should
be dedicated to the sump pump. The pump
is supplied with a 3-wire cord set with
grounding-type plug. Plug the switch directly
into the outlet and plug the pump into the
opposite end of the switch's plug.
Risk of electric shock. Can
shock, burn or kill. Always ground the pump
to a suitable electrical ground, such as a
grounded water pipe, a properly grounded
metallic raceway, or a ground wire system. Do
not cut off the round ground pin.
Figure 6
6. After you have installed the piping, check
valve, and float switch, the pump is ready for
operation.
4
6205 1215
6206 1215

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Myers msci50

Tabla de contenido