Full Power Operation; Maintenance - Sharp AY-XPC7JHR Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 34

FULL POWER OPERATION

In this operation, the air conditioner works at the
maximum power to makes the room cool or warm
so rapidly that you can use it just after you come
home.
1
To activate the FULL POWER operation,
press the FULL POWER button during
operation.
• The remote control will display "
• The temperature display will go off.
• The green FULL POWER lamp (
the unit will light up.
TO CANCEL
Press the FULL POWER button again.
• FULL POWER operation will also be cancelled
when the operation mode is changed, or when the
unit is turned off.
• The green FULL POWER lamp (
will turn off.
NOTE:
• You can not set the temperature or fan speed
during the FULL POWER operation.

MAINTENANCE

BEFORE PERFORMING
MAINTENANCE
Be sure to disconnect the power cord from the
wall outlet or turn off the circuit breaker before
performing any maintenance.
1
Turn off the unit.
2
Wait 15 seconds or more after the open
".
panel is completely closed, and turn off
the circuit breaker.
) on
CLEANING THE FILTERS
The air fi lters should be cleaned every two weeks.
1
Turn off the unit.
2
Remove the fi lters.
Lift the fi lter cover.
1
Push the air filters up slightly to unlock
2
them.
3
Pull the air fi lters down to remove them.
1
3
Take off the air purifying fi lters from the
1
air fi lters.
4
Clean the fi lters.
Use a vacuum cleaner to remove dust. If the
fi lters are dirty, wash them with warm water and
a mild detergent. Dry fi lters in the shade before
reinstalling.
5
Reinstall the air purifying fi lters.
6
Reinstall the fi lters.
Reinstall the fi lters in the original positions.
1
) on the unit
Close the fi lter cover.
2
Push the arrow-marked of the panel fi rmly
3
to lock it in place.
2
GB-12
Filter cover
2
3
3
1

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ay-xpc9jhrAy-xpc12jhr

Tabla de contenido