inSTaLLaTion proCedure
1. valve body installation
Prior to fi nishing wall,
secure valve body onto
wall studs with hole straps�
(recommended height: 18-
1/4" above deck)
Connect hot and cold supply
line� Test valve and inspect
for leakage� put on protective
caps�
Finish wall with 1-3/4"
(44mm) diameter hole on
handle side and max 1-1/4"
(33mm) diameter hole on the
spout side� (Use template on
p.29)
2. handle installation
remove protective caps
insert o-ring cap onto the handle adapter
insert lever handle, secure with small screw and apply index cap
lever handle
setscrew
index cap
1-1/4"
(33mm)
1-3/4" (44mm)
diameter
hot supply
hot supply
line
line
handle adapter
Ceramic
Cartridge
o-ring cap
4
Finish Wall
Cold supply
Cold supply
Cold supply
line
line
line