10.1
10.2
This installation manual must be given to the customer and kept safely during the entire period of use!
*
*
Instruction
Pre-fame can be constructed on site or delivered by Novoferm.
* Remove the braces before installing the leveller.
General instruction: The image may differ at detail level.
General instruction: The image may differ at detail level.
10. Frame BX
EN
13