Hitachi DHWT200E-2.5H1E Manual De Instalación Y Funcionamiento página 23

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 25
1 Periodic review of magnesium anodes
19
19 PERIODIC REVIEW OF MAGNESIUM ANODES
Cathodic protection periodic control
INSPECTION Nº
1
2
3
4
5
6
7
8
9
10
N O T E
• Dear costumer, please check periodically (at least once
every 6 months) the anode load state by pushing the me-
ter button and write down the data In the above table.
• If the measurement is not correct, please call to our cos-
tumer service.
23
PMML0198A-rev.1 - 04/2011
ID. TANK
DATE
CORRECT: %
(GREEN)
MEASUREMENT
INCORRECT
(RED)
C A U T I O N
The anodes must be replaced after an incorrect measure-
ment otherwise the guarantee of this product will be cance-
lled.
REPLACEMENT COSTUMER
SERVICE
(stamp and date)

Publicidad

Tabla de contenido
loading

Tabla de contenido