Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 49

Installation

You must have at hand the following materials:
meter stick, pencil, spirit level, drill, screws maximum Ø6 mm,
screwdrivers.
Installation phases
1
Using the meter stick, pencil and spirit level, measure and
mark the positions for the bracket holes as indicated in fig. 5.
2
Drill the appropriate holes into the supporting wall being
particularly careful not to damage or drill into any electrical
wires or plumbing lines present in the wall.
Fig. 5
Fig. 7
English
16
144 mm - 5,7"
3
Mount the bracket with 4 teeth (see fig. 6) using the screws
(not included).
4
Place the dispenser on wall bracket (see fig.7).
5
Install the protective wiring duct (see fig. 9).
6
Check that the batteries are inserted and the cover is closed
correctly.
7
Plug in the electrical power cord.
Fig. 6

Publicidad

Tabla de contenido
loading

Tabla de contenido