Mains Connection - Hercules HSG 150 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 34
Anleitung_HSG_150_SPK7:_
Important. Check all gas and other connection for
leaks. Check the connections using leak spray or
soap suds.
5.2.4 Information about the pressure reducer
(Fig. 4/19)
The gas delivery rate can be adjusted using the
rotary knob (24). The set gas delivery rate can be
read off the pressure gage (20) in liters per minute
(l/min). The gas is discharged at the shielding gas
hose connector (23) and is then forwarded to the
welding set through the shielding gas hose (Fig.
3/18). (see 5.2.3)
Important. Always proceed as described in point
6.1.3 for setting the gas delivery rate.
The pressure reducer is fitted on the gas bottle using
the screw connector (21) (see 5.2.3).
Important. The pressure reducer may only be
adjusted and repaired by trained personnel. Send
defective pressure reducers to the service address if
necessary.

5.3 Mains connection

Before you connect the equipment to the mains
supply make sure that the data on the rating
plate are identical to the mains data.
The equipment may only be operated from
properly earthed and fused shock-proof sockets.
5.4 Fitting the wire spool (Fig. 1, 5, 6, 28 – 36)
The wire spool is not supplied.
5.4.1 Wire types
Various welding wires are required for different
applications. The welding set can be used with
welding wires with a diameter of 0.6 and 0.8 mm.
The appropriate feed rollers and contact tubes are
supplied with the set. The feed roller, contact tube
and wire cross-section must always match each
other.
5.4.2 Wire spool capacity
Wire spools with a maximum weight of 5 kg can be
fitted in the welding set.
5.4.3 Inserting the wire spool
Open the housing cover (Fig. 1/4)
Check that the windings on the spool do not
overlap so as to ensure that the wire can be
unwound evenly.
11.06.2008
15:18 Uhr
Seite 21
Description of the wire guide unit (Fig. 28-30)
A
Spool lock
B
Spool holder
C Cam pin
D Pressure roller holder
E
Pressure roller
F
Adjusting screw for counter-pressure
G
Clamp lever
H Guide tube
I
Feed roller holder
J
Wire spool
K
Cam opening in wire spool
L
Feed roller
M Hose package mounting
N Adjusting screw for roller brake
Inserting the wire spool (Fig. 28, 29)
Place the wire spool (J) on the spool holder (B).
Ensure that the end of the welding wire is unwound
on the side of the wire guide, see arrow.
Ensure that the spool lock (A) is pushed in and the
cam pin (C) is engaged in the cam opening in the
wire spool (K). The spool lock (A) must engage again
over the wire spool (J). (Fig. 29)
Inserting the welding wire and adjusting the wire
guide (Fig. 30-36)
Release the clamp lever (G), push up the
pressure roller holder (D). (Fig. 30)
Pull back the guide tube (H) if necessary. (see
marking in Fig. 31)
Release the feed roller holder (I) from the lock by
turning it counter-clockwise and remove it
upwards. (Fig. 32)
Check the feed roller (L). The appropriate wire
thickness must be specified on the top of the
feed roller (L). The feed roller (L) is fitted with two
guide grooves. Turn the feed roller (L) over if
necessary or replace it. (Fig. 33)
Fit the feed roller holder (I) again and lock it by
turning it clockwise.
Push the guide tube (H) forwards until it ends
approx. 5 mm from the pressure and feed rollers
(E/L).
Remove the gas nozzle (Fig. 5/12) from the
burner (Fig. 5/13) by turning it clockwise,
unscrew the contact tube (Fig. 6/26). (Fig. 5 – 6).
Place the hose package (Fig. 1/11) on the floor
as straight as possible pointing away from the
welding set.
Cut off the first 10 cm of the welding wire to
produce a straight cut with no shoulders, warping
or dirt. Deburr the end of the welding wire.
Push the welding wire through the guide tube (H)
between the pressure and feed rollers (E/L) into
the hose package mounting (M). (Fig. 34)
GB
21

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

15.749.71

Tabla de contenido