3 Installation and Putting into Operation
This section describes how to set the new instrument into operation.
3.1 Unpacking the device
Delivery
The device is delivered by a local logistics company. All the components included in the scope of
delivery are delivered together in a single package.
Transport damages or missing parts
On receipt of the delivery, check it without delay to ensure that it is complete and undamaged.
If there is any visible external transport damage, proceed as follows:
Do not accept the delivery.
•
Make a note of the scope of damage on the carrier's delivery note.
•
Inform a METTLER TOLEDO representative.
•
Note
Lodge a complaint for each defect as soon as it is identified. Claims for damages can only be made
within the applicable claim periods.
Unpacking device
Proceed as follows to unpack the device:
1 Open the packaging box.
2 Remove the package lifting it on the belt strap.
3 Remove the belt strap around the foam elements.
4 Remove the polystyrene element on the top of the device.
5 Unpack the feeder plate and the plastic cover.
6 Remove the upper foam element.
7 Lift and remove the device from the lower foam element.
8 Remove the belt strap fixing the device.
9 Check the device for transportation damages or missing parts.
10 To assemble the device, proceed as described in [Assembling the device } Page 11].
Note
We recommend retaining all parts of the packaging. The packaging offers the best protection for
transporting the device over long distances.
3.2 Scope of delivery
LV12 including chute
•
Power supply 60 W/12 V DC with country-specific power cable
•
RS232 cable (m/f, 1.0 m) to connect a balance
•
USB cable (A/B, 1.0 m) to connect a PC or balance
•
Operating instructions printed
•
CD-ROM containing USB drivers and operating instructions
•
EC declaration of conformity
•
3.3 Selecting the location
An optimal location will ensure accurate and reliable operation of the device. The following local
conditions must be observed:
10
Installation and Putting into Operation
Automatic Feeder