Hofmann geodyna 7850P Manual De Operador página 36

Equilibradora para ruedas
Ocultar thumbs Ver también para geodyna 7850P:
Tabla de contenido

Publicidad

P15
P16
P17
P19
P21
P23
P25
P26
36
P18
P20
P22
P24
Layout
Symbols relating to OPTIMISATION /
MINIMISATION operations
P15 Start the measuring run.
P16 Apply the Calibration weight.
P17 Provide mark on left tyre side
P18 Provide mark on right tyre side.
P19 Fit tyre on rim and inflate to the specified inflation
pressure.
P20 Turn tyre over on rim.
P21 Rotate rim until valve is exactly perpendicular to
and above the main shaft.
P22 Rotate wheel until valve is exactly perpendicular
to and above the main shaft.
P23 Readjust tyre on rim until the mark coincides
precisely with the valve.
P24 Readjust tyre on rim until the double mark
coincides precisely with the valve
P25 Correction position for both correction planes
reached.
P26 Use a Tyre Changer in order to continue.

Publicidad

Tabla de contenido
loading

Tabla de contenido