en
5 Installation
5.2
Assembly KB2B SGB E (Eurocondense 260 kW-300 kW)
Fig.8
Installation of cascade kit KB2B SGB E
8,12
9,12
11,12
5
11,12
9,12
16
11,12
4
17
8,12
4
11,12
8,12
11,12
14
1 Flow distributor SGB 600 Duo
2 Connection flange DN 65
3 BDF valve ½"
4 Flat gasket DN 50
5 Flat gasket DN 65
6 Flat gasket DN 100
7 Hexagon bolt M16 x 60
8 Hexagon bolt M12 x 60
9 Hexagon bolt M12 x 100
10 Hexagon nut M16
18
Assemble the components listed in the table as shown in
Important
The shut-off valves, check valves and pumps shown with dotted
lines are not part of the standard delivery.
19
18
1
7,13
3
8,12
11,12
5
16
4
17
4
8,12
11,12
16
14
5
2
15
6
10,13
19
18
1
5
8,12
11,12
8,12
11,12
14
11 Hexagon nut M12
12 Washer B13
13 Washer B17
14 Rubber gasket
15 Flange DN 100
16 Shut-off valve DN 65
17 Check valve DN 50
18 Valve extensions
19 Automatic air vent
fig .
6
10,13
7,13
3
8,12
11,12
5
16
8,12
11,12
5
2
8,12
11,12
14
RA-0001884
7306084 - 06 - 07042020
15