Descargar Imprimir esta página

Miele MF01 10–20 Instrucciones De Montaje página 44

Publicidad

Produktgruppe 512
44 von 48
am
Parts required
Quantity
Mat. no.
1
09079440
Note
This service and repair work should only be carried out by a suitably qualified electrician (with specialist training, knowledge and
experience, and recent related work experience) in accordance with all appropriate local and national safety regulations.
Commissioning, servicing, modification, testing and maintenance of electrical appliances should only be carried out in accordance with
all appropriate legal requirements, accident prevention regulations and valid standards. All regulations of the appropriate utility supply
companies and standards relating to safety (not limited to electrical safety) are to be complied with.
Danger!
Even with the machine switched off, voltage may be applied to some components.
Before starting any service work, the machine must be disconnected from the power supply. Suitable measurements must be made to
ensure that this is the case.
A general visual check and risk evaluation should always be carried out. Incorrect conversion or service work can be dangerous (risk of
fire, electric shock, etc.).
Danger!
Correct grounding function can be deactivated if casing parts are incorrectly assembled.
Correct grounding function must be ensured when reassembling the casing.
Carry out appropriate electrical safety checks.
Danger!
During installation, all accessible conductive parts that are not connected to ground must not have any link to ground (strengthened
double insulation).
To confirm this, insulation resistance and touch current measurements must be carried out.
Note
This installation kit for PW 6107, PW 6137 , PW 6167 and PW 6207 contains:
1 electronic EZL 235, module 1 (liquid dispensing 1-6)
4 spacers (for securing the EZL 235 electronic)
1 coded plugs MFM 1-5 (module 1 EZL 235
1 coded plugs MFM 53X (module 1 EZL 235
1 coded plugs 40X (module 1 EZL 235 ST14), pin 1-4
1 N1Q_ST11A plug (module 1 EZL 235
1 wiring harness 20X-41X (module 1 EZL 235
1 wiring harness N1D_ST13, X3-4 (module 1 EZL 235
1 wiring harness N1Q_ST11, Y39 (module 1 EZL 235
1 wiring harness N1L_ST11B, N1Q_ST11 ( module 1 EZL 235
1 0.75x280 blue wire
24.01.2012
Diese Unterlagen dürfen ohne unsere Genehmigung weder vervielfältigt noch Dritten zugänglich gemacht werden. Eigentumsrechte vorbehalten.
Designation
MF01 10 20 multifunction module PWxx7 installation kit
ST3), pin 1-5
ST7), pin 1-2, 3-4
ST11), pin 1-2
ST10 / ELP 235
ST14), 3-pin, 720 mm
ST13 / terminal block X3-4), 3-pin, 350 mm
ST11 / intake valve Y39), 2-pin, 1050 mm
ST111 / ELP 235
Umbau- und Montageanweisung
M.-Nr. 09081900
ST11B), 4-pin, 650 mm

Publicidad

loading