Dear customer
Thank you very much for choosing a weka product.
Read these instructions through completely before assembling your product in order to avoid errors in
assembly or damage.
IMPORTANT
Please use the enclosed packing list to check immediately that your weka product has been
delivered complete and intact.
Please do not dispose of the packing list before the guarantee period has expired. This list enables you
to check that all the individual parts are present. It should be retained along with the proof of purchase.
Any complaints which may arise can probably be easily rectified with this list. The item numbers on the
packing list do not correspond to the item numbers in the following assembly instructions.
We recommend that 2 people carry out the assembly.
We reserve the right to make further technological developments. This means that there many be minor
deviations in the illustrations.
Please do not simply throw away the packaging material. Paper, card and corrugated board as well as
plastic packaging materials should be placed in the correct collection containers.
RECOMMENDATIONS
Please drill pilot holes for all screw connections to avoid damaging the wood. The following symbol in the
instructions will indicate when this is necessary:
A prerequisite for successful assembly, is the anchoring of the studs in the concrete foundation using H
stud supports. The stud supports are available as weka accessories for an additional cost.
A foundation plan can be obtained from your specialist dealer!
In order to facilitate the precise alignment of the H anchors, mark the necessary post clearances on a
piece of guide wood and fix the anchors in place with screw clamps
Then suspend the H anchors in the base holes already prepared. A minimum clearance of 2 cm is to be
maintained between the upper edge of the foundation and the upper strut.
The required gradient can also be achieved by shortening the studs.
After the holes have been filled with C25/30 concrete, the foundation must be allowed to set for at least 3
days.
Safety information and warnings
In order to prevent accidents, we recommend that children be kept out of the direct vicinity during assembly.
During assembly, children under the age of 14 should be kept at least 3 m from the assembly site.
The current occupational safety and accident prevention regulations are to be observed. Information can be
obtained from a builder.
The roof is only to be accessed on load-distributing boards.
When you are working on a roof, avoid the risk of falling by complying with the current accident prevention
regulations (e.g. scaffolding requirements, safety rails).
Agree the required measures and operating conditions with a local builder or competent work safety
authority. Always work with helpers!
When unpacking the loose wooden parts and when assembling the cabin, we recommend that you wear
safety boots and work gloves. When using a drill or saw, you should also wear protective goggles.
The roof is to be cleared of high snow loads (in excess of 1,25 kN/m² or approx. 30 cm in height).