2. Installation and operation
2.1 Installation
The boiler guard is integrated in the pipework. The pipework and manifold must therefore be appropriately secured to ensure they can
bear the weight and other loads. With boiler guards DN50 and above, use the foot provided. Depending on the selected assembly height,
it may be necessary to cut the steel pipe to length. The hydraulic connection does not involve an insulation shell. Ensure there is sufficient
distance from the wall to allow the rear half-shell to be attached during the final assembly step.
2.2 Hydraulic connection
Connect the supply and return lines according to the following illustrations or application examples.
Boiler Guard K:
Boiler guard DN50 and above:
!
! Please note the position of the supply sensor on boiler guards with a hydraulic diverter. Different pipe ends (welded end, flange, threaded
joint, Victaulic coupling) for the union to the heat generator are available for the various dimensions of the boiler guard. Use the appropriate
(reducing) Victaulic coupling for the union to the manifold.
!