Installation - RK Rose+Krieger MultiControl mono Serie Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

7. Life Phases

7.2 Installation

7.2.1 General
The controller is only to be fixed at the points specified for the installation.
Routing of electrical leads
When routing electrical leads, ensure that
these cannot become trapped,
no mechanical load is exerted on them,
they cannot become damaged in any other way, and
obstacles do not pose any risks to persons.
Putting into service
A test run has to be carried out before putting into operation with 1 or 2 columns. The columns
should not be interconnected mechanically at this time. Other connections and mechanical fac-
tors which may damage the columns must not be present. There is a danger of breakage. A check
should be made that the traversing path is switched off safely in the end position.
32

Publicidad

Tabla de contenido
loading

Tabla de contenido