Operation Via Power Unit; Operation; Cleaning And Maintenance; Technical Specifications - EuroLite FL-100 Manual Del Usuario

Ocultar thumbs Ver también para FL-100:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Before rigging make sure that the installation area can hold a minimum point load of 5 times the device's
weight.
Do only use appropriate screws and make sure that the screws are properly connected with the ground.

Operation via power unit

Connect the connection cable of the power-unit (6 V DC, 700 mA) with the DC IN-socket. Plug the power unit
into your outlet.

OPERATION

Before starting operation make sure that the silk cannot be drawn into the intake of the ventilation fan. With
the POWER-switch, you can switch the device on and off.

CLEANING AND MAINTENANCE

We recommend a frequent cleaning of the device. Please use a soft lint-free and moistened cloth. Never use
alcohol or solvents!
There are no servicable parts inside the device except for the batteries. Maintenance and service operations
are only to be carried out by authorized dealers.
In order to replace the battery please refer to "Inserting/exchanging the batteries".
Should you need any spare parts, please use genuine parts.
Should you have further questions, please contact your dealer.

TECHNICAL SPECIFICATIONS

Power supply:
via power unit:
via batteries:
Power consumption:
Dimensions (LxWxH):
Weight:
Please note: Every information is subject to change without prior notice. 22.04.2010 ©
DANGER TO LIFE!
Disconnect from mains before starting maintenance operation!
6 V DC, 700 mA
6 V DC, 700 mA
4 x 1.5 V Mignon
max. 3 W
320 x 150 x 150 mm
0.4 kg
12/20
00053023.DOC, Version 2.2

Publicidad

Tabla de contenido
loading

Tabla de contenido