Troubleshooting - Martin Yale 1217A Instrucciones De Operación

Tabla de contenido

Publicidad

FEED TIRE REPLACEMENT
Step 1
NOTE: IT IS BEST TO REPLACE THE FEED TIRE WITH THE FEED TABLE
REMOVED FROM THE MACHINE.
1.
Using a flat head screw driver, remove the screw from the right side of the
feed tire hub. May require WD40 to loosen.
2.
Remove the E-clip from the shaft on left and right side frame. Remove E-
clip from the right side of the feed tire.
3.
Slide shaft towards the non power switch side, you may feel some
resistance.
4.
With shaft disengaged from the operators side frame at this point, slide old
feed tire off.
5.
Slide new feed tire onto shaft, note the screw hole and make sure that it
faces the non-operators side. Slide fully up to metal clip.
6.
Realign the feed shaft into the operator's side frame. Replace E-clip on
left and right side to hold shaft stationary. Replace E-clip on right side of
feed tire.
7.
Reattach spring to side of feed tire hub. Do not firmly tighten screw.
Screw head should just be in contact with spring when retightening.
JAMMING
There are several reasons that a folding machine will jam. Most commonly, this is
caused by dirty folding rollers or an incorrectly installed component. The sections on
feed table installation and fold table installation should be reviewed before cleaning the
rollers. In the event that the machine should jam, there are several tools incorporated
into its design to remove it. The solutions are listed in the realm of easiest to most
advanced.

TROUBLESHOOTING

Martin Yale Industries, Inc.
251 Wedcor Avenue
Wabash, IN 46992
Info@martinyale com
VIII

Publicidad

Tabla de contenido
loading

Tabla de contenido