BAFFLE INSTALLATION
1. Lift side discharge chute (H, Figure 3).
2. Insert baffle (F) through discharge opening and poso-
tion baffle into place.
3. Tighten carriage bolts (A) and nuts (E) on baffle (F).
4. Tighten carriage bolt (B) and nut (E) on baffle (F).
5. Position baffle (G) into place.
6. Tighten carriage bolts (C) and nuts (E) on baffle (G).
7. Tighten carriage bolts (D) and nuts (E) on baffle (G).
A. Carriage
Bolts,
5/16-18 x 718
B. Carriage
Bolt,
5/16-18 x 718
C. Carriage Bolts,
5/16-18 x 718
D. Carriage Bolts,
5/16-18 x 718
E. Locknut, 5/16-18
F. Right Hand Baffle
G. Left Hand Baffle
H. Discharge Chute
Figure 3. Baffle Assembly