burgbad M1001 Instrucciones De Montaje página 30

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 98
BATHTUB CRONO 2.0
Remove tub, panel and levelling frame from the packaging and check scope of delivery.
Tap support
Panel
Levelling frame
Push rods
Height-adjustable
feet
PLEASE NOTE:
It should be observed that neither supply lines nor fl oor heating is running in the area of the levelling
frame.
The area of installation must be recessed correspondingly.
For reasons of stability, the levelling frame has to be dowelled to the fl oor.
The frame has to be soundly screwed to the fl oor at all eight fastening points.
Dowels and screws used must be appropriate for the fl oor.
30

Publicidad

Tabla de contenido
loading

Tabla de contenido