6
7
8
9
10
INSTALLATION
Installing/Replacing the lamps
Before replacing the lamp, unplug mains lead and let the lamp cool down (approx. 20 minutes).
During the installation do not touch the glass-bulbs bare-handed! Please follow the lamp manufacturer's
notes!
Do not install lamps with a higher wattage! Lamps with a higher wattage generate temperatures the device
was not designed for. Damages caused by non-observance are not subject to warranty.
For the installation, you need three 230 V/500 W GY-9.5 lamps.
During the operation, the lamp reaches temperatures of up to >1000° C.
Procedure:
Step 1: Unscrew the fixation screws of the lamp service lid.
Step 2: Remove the service lid.
Step 3: If replacing the lamp, remove the old lamp from the lamp-socket.
Step 4: Insert the new 230 V/500 W GY-9.5 lamp into the lamp-socket.
Step 5: Replace the service lid and tighten the screws.
RGB
DMX
C&B
SIGNAL
COLOR
MODE
UP
DOWN
DANGER TO LIFE!
Only install the lamps with the device switched off!
Unplug from mains before!
CAUTION!
The lamp has to be replaced when it is damaged
or deformed due to the heat!
17/43
(6) Attachment eyelet
(7) Ventilation fan
(8) Power supply
(9) Fuseholder
(10) LCD Mode Display
11
(11) OUT Socket
(12) IN Socket
12
41601025X98NXS_V_1_0.DOC