Assembly
1. Fasten the carrying strap(s) [6] and the pump holder [8] on the tank [1]. (Figs. 2a + 2b)
2. Screw the spray line [4] tightly into the outlet port [10]. (Fig. 3).
Note the location of the spigot in order to be able to insert the lock.
3. Insert the lock [11]. (Fig. 3).
► The lock closes and the spray line is secured from unscrewing out of the tank.
4. Screw the spray lance [7] onto the shut-off valve [9] (Fig. 3).
Checks
Visual inspection: Are the tank [2], pump [2], spray line [4] with shut-off valve [9],
pressure gage [16 and 19] and spray lance [7] free of damage? (Figures 1, 11, 15)
Pay special attention to the connections between the tank – spray line and the spray
line – shut-off valve and to the condition of the pump threading and spray line.
Pump up the empty device to 2 bar.
No leaks:
► The pressure must not decrease more than 0.5 bar within 30 minutes.
Function: Pull the red button on the safety valve [12]. (Fig. 4).
► The pressure must dissipate.
Activate the shut-off valve [9] (Fig. 15).
► The shut-off valve must open and close.
Making preparations
Observe the instructions in the section entitled "Safety".
1. Pull up the red button on the safety valve [12] until all excess pressure is released from
the tank. (Fig. 4).
2. Press the pump handle [13] down and turn it counterclockwise.
► The pump handle is locked in place. (Fig. 5).
3. Unscrew the pump [2] from the tank [1]. (Fig. 6).
To ensure the pump remains clean during storage, we recommend you attach the
pump [2] to the pump holder [8]. (Fig. 7).
We recommend you mix the spraying liquid in the device or premix it in an external tank:
Fill to 1/3 with water, pour in the spraying agent, and then add more water until full.
4. Add the spraying liquid to the tank [1] (Fig. 7).
5. Check the filling height through the viewing glass [15] of the shut-off valve [9]. (Fig. 8).
All excess pressure must be released from the device.
Movee the shut-off valve [9] on the tank [1] from top to bottom several times while
pressing the lever (the level of liquid in the hose line and tank is equalized). The level of
liquid visible in the viewing glass [15] then corresponds to the filling height of the tank,
which can be read on the scale [14]. (Fig. 8).
6. Screw the pump [2] into the tank [1]. (Fig. 9).
7. Swivel in the pump holder [8]. (Fig. 9).
14