Planing - LEMAN RAD260 Manual De Instrucciones

Tabla de contenido

Publicidad

5.1 –IMPOTRANT – WIRING INSTRUCTIONS
For machine with a single phase motor (220-240 volt) the mains is to be connected in accordance with the following color
code.
Green and Yellow
Blue
Brown
3-Phase Motors
Machines fitted with 3-phase motors are connected to the mains using a 5-pin industrial appliance-inlet/connector.
Ensure it is wired and connected only by a qualified electrician.
-IMPORTANT-OPERATION INSTRUCTIONS
There are two switches on the panel.
Right is the NVR-SWITCH.
Left is the Model-Exchanging Switch, "
planer model; "
" is stop model; "
thicknesser model.
For
your
own
safety,
Model-Exchanging Switch on "
the machine is not in use.

6.0 Planing

The following must be operated before planing.
6.1 Turn the Model-Exchanging Switch on planer model. (
6.2 Set thicknessing bed to approx. 2/3 capacity and place suction connector onto it. Raise thicknessing bed to lock suction
connector in position. Make sure that the notch in top if the connector locks in the spacer shaft. Turn the handle clockwise to
keep the chip ejection holding the safety switch for planer.
Warning: This appliance must be earthed!
- Earth
- Neutral
- Live
IF IN DOUBT- CONSULT A QUALIFIED ELECTRICIAN
" is
" is
always
place
the
" position when
EN
Green
-Earth
White
-Neutral
Black
-Live
5

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido