Descargar Imprimir esta página

Eco-De ECO-2595 Manual De Instrucciones página 10

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation diagram
Step one:
Riser
The electronic form part of the riser and lifted up, with two M8 *55 screw holes
through the connection, plus gasket nut.
Step two:
Electronic control panel and handrails
1: e-table arm lifted up, with two M8*55 screw holes through the arm to the riser, con-
firm tighten. (Do not press to the signal line)
2- The handrail cover sets in the arm tube
Step three:
U-tube
First, respectively, wear rubber guard both ends of the pipe, with two M8*55 screw U-
tube to the left and right of the riser, then into the riser rubber guard.
Step four:
Functional planes
1: 1 M8*60 screws and two washers, then tighten
2: 1M8*83, 1 nuts, 2 gaskets, frame and chassis in the function of adding a rubber pad,
and then tighten
Step five:
Head massage
The massage machine head off the 3 screws, then put it in a good functional metal fra-
me holes on the chip, the 3 screws up, then fitted belt.
Step six:
Plug in the power, turn the power switch, the safety lock into the position of the corres-
ponding electronic appearances, you can start using the (read the instructions before
using)
Technical specification
Product size: 165x73x142cm
Fold size: 76x73x142cm
Running size: 120x40cm
Max bear weight: 150kg
Led screen: speed time, distance, calorie, pulse
Power: ~110V/220V 50/60Hz
Max power: 1.5HP
Speed: 1-12KM
10

Publicidad

loading