Setup And Preparation For Operation - benza BLS-5TB Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SET UP AND PREPARATION FOR OPERATION
1. Bolt the support Leg to the Log Splitter, lift the log splitter by the handles at both ends
and place it on a 2 - 2,5 ft (60-80 cm). high, stable, flat and levelwork surface.
2. Familiarize yourself with the controls and features of this log splitter in the illustrations.
1. Log Pusher
2. WorkTable
3. Wedge
4. Lift Handle
5. Support Leg
6. Log Retainlng Plates
7. Switch
8. Motor
9. Push button Box
10. Wheels for MinorMoving
ONLY.
11. Hydraulic Control Lever
12. Control Lever Guard
13. Bleed Screw
14. Oil Drain Bolt w/ Dipstick
Before operating the log splitter, the Bleed Screw should be loosened by a few rotations
until air can go in and out of the oil tank smoothly.
Air flow through the Bleed Screw hole should be detectable while the log splitter is under
operations.
Before moving the log splitter, make sure the Bleed Screw is tightened to avoid oil leaking
from this point.
FAILURE TO LOOSEN THE BLEED SCREW WILL KEEP THE SEALED AIR IN
HYDRAULIC SYSTEM BEING COMPRESSED AFTER BEING DECOMPRESSED.
SUCH CONTINUOUS AIR C0MPRESSION AND DECOMPRESSION WILL BLOW
OUT THE SEALS OF THE HYDRAULIC SYSTEM AND CAUSE PERMANENT
DAMACE TO THE LOG SPLITTER.
5
ENGLISH

Publicidad

Tabla de contenido
loading

Tabla de contenido