ENGLISH
- FAF. Fixed fork for boom rest
- MOOVI GA. Movable rod for boom rest (Only for MOOVI 50 RMM)
- MOOVI GAMA. Movable cushioned rod for boom rest (Only for MOOVI
30/50 RMM).
- SB. Skirt already assembled to the boom (Only for MOOVI 30/50
RMM).
- Safety edge BIR
- MOOVI LIGHT. Light kit for booms from 3m to 4.5m
- MOOVI LIGHT 1. Light kit for booms from 5m to 6m
- MOOVI PCA. Lower or upper boom covering contour
For further information about installation and use of the accessories, make
reference to their respective instruction manuals.
5) FOUNDATION PLATE (Fig.2)
- Prepare a foundation hole suitable for the particular kind of
ground.
- Layout several raceways for the electric cables to pass through.
- Position the screws supplied with the CBO mod. base into the 4 fixing
holes with the thread facing upwards. Weld the 4 screw heads to the
base and protect the welds with rust preventer. Position the base so
that it protrudes about 20mm from the floor (fig.2).
- Fill the hole with concrete, checking the position of the base in both
directions by means of a level, and let the cement harden.
6) FITTING OF THE ACTUATOR
WARNING! The barrier must be exclusively used for vehicles to
drive through. Pedestrians must not walk within the operator
manoeuvring area. An appropriate pedestrian passageway must be
provided for.
The passageway must be suitably indicated by means of the warning
signs illustrated in Fig.10.
WARNING: before opening the door, make sure that the spring has
been unloaded (rod at 43°). The door of the box must face the inside of
the property. When standing in the middle of the passageway, if the box
is on the left the barrier opens to the left, and if the box is on the right the
barrier opens to the right.
The actuator is always supplied for left-hand side fitting.
6.1) Left-hand fitting
- Fix the operator to the foundation base and secure it by means of nuts
M12 (fig.4 ref.1). The door of the box must face towards the inside of the
property.
- The upper surface of the operator is slightly tilted so as to prevent any
rain water from being trapped there. Therefore use a side surface to
check correct positioning by means of a level (fig.2).
- The installation of the MOOVI PRM antishearing Kit (optional) is easier
when carried out before fitting the boom to the operator.
Make reference to Fig.18 and paragraph 6.4 for correct fitting of the
MOOVI PRM Kit, then proceed to fit the boom.
- Fit the boom in its opening position (vertical) as indicated in fig.3, ref.7.
The operator balancing is pre-calibrated for the nominal boom in the
opening position (balancing spring stretched).
- Position the cover closing element (fig.3 ref.10) on the boom, as indi-
cated in fig. 3. After positioning, drill part 10 and boom using a 2 mm
bit. Insert the screw supplied.
- Fix the boom using the bracket (fig.3 ref.4) and the screws and wash-
ers supplied as standard, then fix the protection cover (fig.3 ref.8)
and finally the screw cover (fig.3 ref.9). Close the protection cover by
making the closing element slide over the boom (fig.3 ref.10).
WARNING! The boom must be positioned so as to have the double
contour facing down (fig.3 ref.11).
- Balance the boom as described in relevant paragraph 7.
6.2) Right-hand fitting
Some internal members need to be moved, with reference to fig. 4 and
the following procedure:
A) Fix the box to the foundation base and lock it in position using M12
nuts.
B) Ensure that the balancing spring is in the opening position (stretched
spring - fig.5).
C) Completely slacken the spring stretcher (fig.4/ref. 2) until the screw
(fig. 4/ref.3) anchoring it to the bottom of the box can be removed.
D) Remove the bar locking bracket (fig.4/ref.4) and slacken the screw
(fig. 4/ref.5) by means of a CH19 socket spanner until the lever can
be rota-ted (fig.4/ref.6).
E) Rotate the lever (fig.4/ref.6) by 180° and fasten it into the correct posi-
tion.
F) Tighten the tie rod (fig. 4/ref.5) blocking the lever (fig.4/ref.6) by means
of a torque wrench set at about 80 N/m.
18
- MOOVI 30S-30RMM-50RMM Ver. 05
INSTALLATION MANUAL
G) Bring the release key (fig.6) to the manual operation position and
manually rotate the lever (fig.4/ref.6) downwards by 90° (fig.7) so as
to bring the barrier to the right-hand opening position.
H) Lock the spring stretcher (fig.4/ref.2) into position (fig.4/ref.Dx) with
the screw and self-locking nut.
I) Adjust the spring stretcher (fig.4/ref.2) until the spring comes under
tension.
L) Refit and partially fix the U bolt (fig.4/ref.4) holding the bar to the actua-
tor in the opening position.
M) The installation of the MOOVI PRM antishearing Kit (optional) is easier
when carried out before fitting the boom to the operator.
Make reference to Fig.18 and paragraph 6.4 for correct fitting of the
MOOVI PRM Kit, then proceed to fit the boom. Fit the boom in its
opening position (vertical) as indicated in fig.3, ref.7. The operator
balancing is pre-calibrated for the nominal boom in the opening posi-
tion (balancing spring stretched).
Position the cover closing element (fig.3 ref.10) on the boom, as indi-
cated in fig. 3. After positioning, drill part 10 and boom using a 2 mm
bit. Insert the screw supplied.
Fix the boom using the bracket (fig.3 ref.4) and the screws and wash-
ers supplied as standard, then fix the protection cover (fig.3 ref.8)
and finally the screw cover (fig.3 ref.9). Close the protection cover by
making the closing element slide over the boom (fig.3 ref.10).
WARNING! The boom must be positioned so as to have the double
contour facing down (fig.3 ref.11).
N) Carry out bar balancing as described in paragraph 7.
O)
Invert the limit switch connections and the motor drive connections
insi-de the control unit (Fig.19), with reference to the instructions regar-
ding the existing control unit. Fig.8 shows a diagram highlighting the
connections to be inverted.
6.3) Fitting of the metal mass detector device
A DIN bar, which allows the DIN module to be connected, is fitted to the
versions suitable for the use of a mass detector. For connection, refer
to the relevant instruction manual. In the case where the bar balancing
device hinders the adjustment of this device (left-hand barrier), remove it
from its socket, carry out the adjustment and then reposition it.
6.4) Fitting of MOOVI PRM antishearing Kit (Fig.16)
1) Remove the rubber plugs.
2) Join two pivots "P" to antishearing plate "L" so as to obtain a single
body.
3) Fix the plate to the box by putting screw M6x20 through the central
threaded hole in the box.
4) Fix rotation lock screw M6x10 through the side threaded hole in the
box.
5) The antishearing plate is to be positioned on the boom opening, the
lock screw through the remaining hole.
6) During subsequent fitting of the cover, the plate must be inserted
between two guide pivots "D" fixed by means of screws C.
Having completed the fitting procedure, check that the antishearing plate
operates correctly. When the barrier is lifted, it must be in the position
indicated in Fig.16, ref.7; when the barrier is being closed, the plate must
follow the boom movement until it reaches the position indicated in Fig.16,
ref.8.
6.5) LAMPO/LAMPO-PA blinker fitting (Fig. 23)
Blinker installation is carried using one of the two upper fittings on the
MOOVI barrier. It is indispensable to use the SLM2 fixing bracket. It is
also recommended to install the blinker on the side of the barrier opposite
to the boom opening direction.
Making reference to Fig. 23, proceed as follows:
1) Remove protection cover "C" positioned on the barrier.
2) Remove cover "D" from the SLM" bracket.
3) Having laid the connection cables to the blinker, fix the SLM2 bracket
to the barrier by means of the appropriate screws (supplied).
4) Spacer "E" is only necessary for the "PA" series blinkers (suitable for
the receiver antenna). For blinkers without antennas, the base is to
be directly fixed to the SLM2 bracket.
5) Reposition cover "D".
6) Complete fitting and wiring as specified in the instructions for LAMPO/
LAMPO-PA.
6.6) Photocell fitting (Fig. 24)
The photocell can be installed on the MOOVI barrier as follows:
1- By directly fixing the CELLULA 130 photocell to the side of the barrier
(Fig. 24 "A")
2- By fastening the MOOVI 130 photocell post to one of the front fittings
(Fig. 24 "B")