7 Bench Alignment
7.1
Static Alignment
Keep the build line between pivots as shown, using shift and/or tilt devices as necessary.
½
In-Line
Filter
Check
Valve
*
Approx. 1/3
Build
Line
½
2/3
Align transfemoral devices according to the
instructions for use that are supplied with the
knee.
Tilt setting
Align limb to achieve range of motion shown.
For the Vacuum System
Assembly see section 8.0
Wrap the vacuum tubing
around the pylon as shown and
position the Check Valve close
to the ankle for the best vacuum
performance.
*
Allow for users
own footwear
11
3°
6°
938367S/5-0520