LaserLiner AC-tiveMaster Digital Manual De Instrucciones página 12

Tabla de contenido

Publicidad

5
If the symbol R (7) appears in
the display, this means that the
presumed phase L1 is actually
phase L1 and the presumed
phase L2 is actually phase L2.
!
When you crosscheck this by switching round the test
prods, the opposite symbol should light up instead.
6
Battery lamp
To switch on the battery lamp, press and hold down button
10. The light switches itself off automatically as soon as the
button is released.
7
Calibration
The voltage tester needs to be calibrated and tested on a regular
basis to ensure it produces accurate measurement results. We
recommend carrying out calibration once a year.
EU directives and disposal
This device complies with all necessary standards
for the free movement of goods within the EU.
This product is an electric device and must be
collected separately for disposal according to
the European Directive on waste electrical and
electronic equipment.
Further safety and supplementary notices at:
www.laserliner.com/info
12
GB
If the symbol L (7) appears in
the display, this means that the
presumed phase L1 is actually
phase L2 and the presumed
phase L2 is actually phase L1.

Publicidad

Tabla de contenido
loading

Tabla de contenido