Installing Router Table On Stand; Lifting With Forklift - Powermatic PM-2X2R Instrucciones De Operación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Figure 7-13
11. Slide electrical cabinet (R2) into opening, while
feeding the attached cables through rear holes
(Figure 7-14).
12. Install louvered side panel (S6).
Figure 7-14
13. Install remaining side panel (S5, Figure 7-15).
The stand is now complete.
14. Rest the server cables through slot on rear
panel (X, Figure 7-15). Feed the electrical cable
underneath stand so that plug can be accessed
after installing router table.
Figure 7-15

7.8 Installing router table on stand

Router table assembly is heavy;
use forklift, hoist or other secure means to lift.
Never lift router table by the
gantry or damage to machine may occur. Keep
straps or forks away from any parts that could be
damaged during lifting.

7.8.1 Lifting with forklift

1.
Place a scrap block beneath router assembly to
hold it up, and slide forks carefully beneath
router table base (Figure 7-16). Make sure forks
are long enough to extend past opposite end of
table. Raise router table.
2.
Place rubber foot pads (HP023, Figure 7-17)
over holes in stand.
3.
Lower router table assembly while aligning
holes in router assembly and stand. Make sure
table assembly is properly oriented to stand.
4.
Insert
four
(HP024/025) loosely to ensure hole alignment.
Remove forks and tighten screws.
5.
Place a level on the aluminum table and level
table in all directions, adjusting the leveling feet
as needed.
15
Figure 7-16
screws
with
flat
washers
Figure 7-17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pm-2x4sp

Tabla de contenido