5 Assembly [specialist]
NOTICE
Damage to property!
The location of installation must be dry, load-carrying, frost-proof and protected against
ultraviolet radiation to prevent material damage to the installation.
Keep in mind that the flow is connected to the pipe connection marked "V" and the return is
connected to the pipe connection marked "R".
The low-loss header can be either mounted onto a boiler connection or directly to the wall with
wall brackets. The boiler connection and the wall brackets are not included in delivery.
5.1
Option 1: Installation onto a boiler connection
1. Choose the position for installation.
2. Connect the boiler connection to the boiler as described in the instructions.
3. Take the low-loss header out of the insulating shell.
4. Put the low-loss header with the seals onto the boiler connection.
5. The boiler connection is normally equipped with compensation threads.
Use the compensation threads to adjust the low-loss header horizontally.
6. Firmly tighten the compensation threads.
2017/01
993x42x3-mub-ml – V01
5 Assembly [specialist]
B-6