3
> Reposition the fixing ring to accommodate different wall thicknesses.
> Use 5 mm drill bit.
> Drill the holes and install supplied screws.
4
27 mm
> Confirm that the valves of the BlueBox are
in the right position.
> Install hot and cold supplies.
Ø 5 mm
Tap unit malfunction due to
NOTICE
dirty pipes
> Flush the pipes according to the applicable
standards before mounting the tap unit.
NOTICE
Likelihood of confusion
> Ensure the correct operation: install the hot
supply on the left and the cold supply on the
right.
9
MAL_57171/19.03.2