FASTENING OF ARM TO GATE / PRELIMINARY CHECKS
Before starting installation, you should carry out the following checks, as well as making sure the structure is
compliant with current standards. Specifically:
•
Check that the wall and/or column are in good condition. If they are not, the fastening points will need
to be reinforced.
•
Make sure that the travel of the doors is not obstructed in any way. There must be no friction on the
door, either while opening or closing. If it is stopped in any position it must not move. During
movement it must not slip.
May not be placed in service until the machine into which it will be incorporated has
been declared compliant with the provisions of EEC directive 22/06/98.
ASSEMBLY
Open the packaging and check the condition of all the parts of the automation.
.
Holes for
expansion
screw
Screws
M8x50 TCE
UNI 593 ZN 8.8
12