RK Rose+Krieger RKMultiControl duo accu Instrucciones De Montaje página 50

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

7. Working life
The initialisation run can be performed with any hand switch if no fault is present:
2-key hand switch
Ensure that all drives and controllers are interconnected and that the mains plug is not con-
nected. If you have pulled out the mains plug to perform an initialisation run, wait for at least
30 seconds before plugging it back in.
Keep the DOWN
Plug the mains plug in and wait for about 5 seconds.
Release the keys.
Press the DOWN key
the lower end stop.
Press the UP key
Should it be impossible to reach the top end stop, the initialisation run can be ended in any po-
sition by keeping the DOWN key
the drives.
The initialisation run is complete.The controller is now ready for operation. The operation of the
2-key or 6-key hand switch is described in sections 7.11 and 7.12.
50
and UP
keys on the hand switch pressed at the same time.
again and keep it pressed until all drives have moved to or are at
and keep it pressed until all drives have moved to the upper end stop.
pressed for 5 seconds. The position is the new end stop for

Publicidad

Tabla de contenido
loading

Tabla de contenido