dirna Bergstrom bycool DINAMIC 1.1 Instrucciones De Montaje página 19

Ocultar thumbs Ver también para bycool DINAMIC 1.1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

DINAMIC 1.1
PRIOR OPERATIONS:
• Disconnect the battery.
• Take down the evaporation unit's air distribution
interior panel.
CABIN INTERIOR:
1
Position the template supplied and mark the
boreholes.
Make through bore Ø4 with long broach in bore
2
position Ø48, and then make the following
bores.
A- make (1) Ø35 borehole in upholstery
only.
B- make (1) Ø19 borehole in upholstery
only.
C- make (1) Ø48 borehole in upholstery
only.
D- make (4) Ø22 borehole in upholstery
.
only
Air conditioning for vehicles
60 mm
1
UP
1
ARRIBA
Ø 22
Ø 22
19
UP
Ø48
Ø35
Ø19
ARRIBA
Ø 22
Ø48
2
Ø35
Ø19
Ø 22
D
C
A
B
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido