Descargar Imprimir esta página

Jøtul FS 166 Manual De Instrucciones página 45

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 59
Fig. 13
A
B
1.
Centre the insert laterally.
2.
Position the insert and the frame against the front of the
surround.
3.
Make sure that there is clearance between the lower edge
of the frame and the stone below (Fig. 13 A) by adjusting the
foot screws (Fig. 13 B).
4.
Adjust the foot screws until the insert is perfectly level.
Fig. 14
1.
Use bracket 5 (Fig. 14 A) on layer 3 and 4.
2.
Adjust the brackets with bare hands if necessary to make
them hold the stones together.
Fig. 15
B
1.
Place the attachment bracket on the special corner stone
223628 (Fig. 15 A). The front stone (Fig. 15 B) of layer 5 shall
rest on the attachment bracket.
4 psc. M10x35
A
A
223628
Fig. 16
A
Install the flue pipe. Top smoke outlet (Fig. 16 A) or rear
1.
smoke outlet (Fig. 16 B). If a rear smoke outlet: Remove the
knockout in the rear plate (Fig. 16 C).
Fig. 17
F
E
D
B
A
If top smoke outlet:
Place the last layer (Fig. 17 A) and the top layer (Fig. 17 B). Use
1.
bracket 2, bracket 4 and bracket 6 between the last layer and
the top layer (Fig. 17 C).
Remove the knockout and place the top grid (Fig. 17 D).
2.
Place the distance pieces (Fig. 17 E), remove the knockout
3.
and place top heat shield (Fig. 17 F).
If rear smoke outlet:
Place the last layer (Fig. 17 A) and the top layer (Fig. 17 B). Use
1.
bracket 2, bracket 4 and bracket 6 between the last layer and
the top layer (Fig. 17 C).
Place the top grid (Fig. 17 D).
2.
Place the distance pieces (Fig. 17 E) and place top heat shield
3.
(Fig. 17 F).
ENGLISH
B
C
C
45

Publicidad

loading

Este manual también es adecuado para:

I 570