4.0 finishing
installation
EN
WARNING
!
•
Power supply service must be completed prior to finishing to avoid reconstruction.
•
Heat vents and air openings cannot be covered in any circumstances.
4.1
glass door removal
WARNING
!
•
Glass may be hot. Do not touch glass until cooled.
•
If equipped with door latches that are part of a safety system, they must be properly engaged. Do not
operate the appliance with latches disengaged.
•
Facing and/or fi nishing materials must not interfere with air fl ow through air openings, louvre openings,
operation of louvres, or doors/access for service. Observe all clearances when applying combustible
materials.
•
Before door is removed, turn the appliance off and wait until appliance is cool to touch. Doors are heavy and
fragile so handle with care.
Place one hand on the glass panel and remove the 2 screws from the top of the appliance.
A.
Carefully, lift the door up and away from the appliance.
B.
4.2
crystal / pebble media installation
The appliance comes with the log bed already installed, to switch to crystal / pebble media follow these steps:
The glass front must be removed and the appliance must be mounted in its
final location before crystals or pebbles are installed.
Clean crystal media: Crystal media may have a fine oil residue that
A.
needs to be cleaned prior to installation. Clean the crystal with mild
dish soap, drain, rinse thoroughly and dry before placing into the
tray.
Remove the 2 log bed screws on either end of the appliance and lift
B.
the log bed out.
Place the media tray onto the front of the appliance opening
C.
Carefully place crystals or pebbles into the bottom tray on the front of the appliance as illustrated. Apply
D.
an even layer from side to side. Re-secure the glass panel.
10
W415-1751 / 04.25.17
47.1
Glass Panel