Vertical and Horizontal Ducted Venting Installation with the optional Kit Chimney
Installation with the optional Kit Chimney - Preparation of Hood
1
Remove the 4 screws as shown and take off the cover plates.
Do not discard and set aside for future use.
3
Open the panel, unlock the security cable as shown.
back of the unit and at the same time pulling downward.
18
2
shown in image above, to disconnect the left and right
Connectors from the blower.