Assembly
(Continued)
• Save all instructions
How to Assemble the Tines
To Remove Tines:
1 . Remove the pins from each end of the tine shaft . Refer
to Figure 3 .
2 . Slide the four tines off the tine shaft .
To Install Tines:
The 4 different tines are labeled "A", "B", "C", and "D" . Refer
to Figure 4a for the location of the label .
For a 10" tilling width:
1 . Assemble the tines as shown in Figure 4b . Make sure
the collars of the tines are facing each other .
2 . Insert the pins into the holes at each end of the tine
shaft to lock the tines into place . See Figure 3 .
For a 7" tilling width:
1 . Only assemble tines B and C (the two inside tines) . Do
not assemble tines A and D (the two outside tines) .
Refer to figure 4b .
2 . Insert the pins into the INSIDE holes of the tine shaft to
lock the tines into place . See Figure 5 .
Questions? Call Toll Free at 1-800-737-2112
Pin
D
C
Pin
ENG - 7
Copyright © 2018 MAT Engine Technologies, LLC
Fig. 3
Fig. 4a
B
A
Fig. 4b
Fig. 5