4. Assembly
4.1 Assembly
Fig. 2: Removing the locks
Fig. 3: Installation of the inlet and outlet
22
Risk of electric shock! Prior to commencing any installation work, isolate the sys-
tem from the power supply and safeguard against unintentional reconnection! All
electrical work in connection with the installation must only be carried out by a
qualified electrician!
The locks inside the openings must be removed before installing the inlet and out-
let connections.
2
1
1. Remove the locks (1) with pliers out of the inlet opening (2) and the outlet
opening (3)
5
4
2. Stick the inlet connection with the pipe screen(4) to the stop in the inlet open-
ing and secure with the hose clamp (5)
3. Stick the outlet connection with the pipe screen (6) in the outlet opening and
secure with the hose clamp (5)
4. Distribute the granulate evenly in the neutralisation pipe by shaking
Attention! If the inlet and outlet are completely covered with granulate, there is
the risk of getting plugged!
Neutralisation unit NEOP 300