Descargar Imprimir esta página

Machine Record Log - Calorex SLIMLINE PPT8 Manual De Instrucciones

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Manual
PPT8/12/16/22LX/LY SLIMLINE

14.0 Machine Record Log

In order to comply with European Union F-Gas regulations, it is necessary to leak test
hermetically sealed systems with more than 6kg refrigerant annually. The operator of the
unit is responsible for seeing that the test is carried out.
For machines affected see datasheet section 9.0. A sample log sheet can be seen below.
General Information
Plant Name
Location of Plant
1
Plant Operator
2
Operator Contact
Refrigerant Type
Plant manufacturer
Refrigerant Additions
Date
Company
Refrigerant Removals
Date
Company
Leak Tests
Date
Company
Follow up Actions
Date
Company
Testing of Automatic Leak Detection System (if fitted)
Date
Company
1
Name and address of company operating plant.
2
Contact details for operator's nominated person responsible for F Gas compliance.
3
Company and technician carrying out work, with details to provide evidence of compliance.
Calorex Heat Pumps Ltd. · The Causeway, Maldon, Essex CM9 4XD, UK
Calorex Heat Pumps Limited
3
Engineer
Amount Added kg
Name
Engineer
Amount Removed kg
Name
Engineer
Test Result
Name
Engineer
Related to test on
Name
Engineer
Test Result
Name
Serial Number
Refrigerant Quantity installed (kg)
Year of installation
Reason for addition
Reason for removal What done with recovered
refrigerant
Follow up action required
Actions taken
Comments
Page 34
®
SD638150 ISSUE 11

Publicidad

loading

Este manual también es adecuado para:

Slimline ppt12Slimline ppt16Slimline ppt22lxSlimline pptly