12. Check list

#
Action
Is the system facing south (for North hemisphere) or north (for South hemisphere)?
1
Have you checked that the system is not under shadow?
2
Is the collector installed with an inclination of 15-40 degrees?
3
Is the system installed at least 1m from the walls or the end of the roof?
4
Did you use the current manual?
5
If the main pressure is higher than 4 bar, have you used pressure reducer?
6
Have you checked the tightness of all bolts and nuts?
7
All connection pipes must be well insulated and protected against UV radiation. Have you proceed to
8
the correct insulation process?
Do you make sure there are no leakages?
9
Have you checked for leakage at the magnesium anode opposite to the flange?
10
If water temperature exceed 50C, have you installed mixing valve?
11
Do you use original glycol?
12
Have you checked the correct function of the safety devices?
13
Did authorized electrician realized the electrical connections?
14
Have you started up the system according to the manual?
15
YES
NO
57

Publicidad

Tabla de contenido
loading

Productos relacionados para Fondital Sulpack Natural Plus 150

Este manual también es adecuado para:

Sulpack natural plus 200Sulpack natural plus 300

Tabla de contenido