Descargar Imprimir esta página

SPX Johnson Pump Bilge Alert Manual De Instrucciones página 8

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 18
> English
Wiring:
1. See wiring diagram page 27. The wiring connections should be
made with water resistant permanent terminals. Liquid electrical
tape should be used to coat the terminals. The mount connections
should be above the highest water level.
2. Make sure to install an inline fuse rated at 1A, see diagram on
p. 27
Operation of detector:
1. After installation of the detector is complete, press the "test"
button (top position on momentary switch). If the wiring is correct
the alarm will activate. The alarm should turn off as soon as the
switch is no longer in the "test" position. If the switch is in the
"armed" position (lower position) the system is activated. When
water is present in the bilge of the vessel, the buzzer will go off
and a red light will be activated simultaneously. The alarm and light
will stay on until either the water level drops below the detector
level or the operator places the switch in the "off" position (middle
position). Please note that in the "off" position, the red light will
still activate without the buzzer, if there is water in the bilge of the
vessel.
2. Make sure to test the detector. You may test your detector by
removing the mounting screw from the detector and submerging
the detector in a cup of water. The detector should activate after
8 seconds. Re-install detector after test is complete. If buzzer
8
Original instructions

Publicidad

loading