Leviton 74000 Serie Instrucciones De Instalación página 6

Panel pst de corriente alta tres fases
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

To WIrE:
1. Thread wire leads through conduit to the High Current SPD Panel enclosure. Hole must be drilled
on the panel side you find most convenient to use.
2. Connect wires per Figure 2 as follows: Black to Phase (Line 1, Line 2, Line 3) as labeled on the
internal terminals. White to Neutral and Green to Ground as labeled on the internal terminals.
Terminal screw torque requirements: #10 AWG (35 in.-lbs.), #8 AWG (40 in.-lbs.), #6 AWG
(45 in.-lbs.).
3. Select circuit breakers as close as possible to the side of the SPD Panel you are using. 30A
circuit breakers are recommended (although a lower or higher rated breaker can be used since
the intent is to serve as a disconnect during servicing only), and may share SPD and branch
SurGE CounTEr
Welcome to LEVITON Mfg.
Power Quality Division
V.I.X. Self–testing...
Test
Enter
Display 1
Page 4
Figure 2
3Ø High Current SPD Panel Installation
Line 1
Line 2
Line 3
AUDIO
Reset
ALARM
SurGE CounTEr
To set clock
01/01/02 00:00a
Year 2002
Test
Enter
Display 2
Line 1
Line 2
Line 3
AUDIO
Reset
ALARM

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

75000 serie76000 serie77000 serie78000 serie79000 serie

Tabla de contenido