Post Installation Tests

Upon installation completion, verify that the SMPS is functioning by
conducting the "Verify Modules" and Bus Communication tests, from the
ProSYS menu.
Technical
Specifications

General

Efficiency: 93% @ 1A load, 85 % Min @ 3A full load
SMPS card dimensions (HxWxD): 90mm x110mm
Weight: 0.14Kg
Main Panel Connection: RS485, 3 Wire Bus, up to 300m from Main panel.

Input

Power: 16.5VAC @ 50VA (via 230VAC/16.5VAC/50Hz transformer).
Rechargeable Standby Battery: 12V Up To 21 Amp-Hours (AH)
Low Battery Threshold: 11V

Output

Auxiliary output: 3A @13VDC
Bell/Siren output: 1.7A @13VDC
Overload Protection: Automatic Electronic Protection

Utility Output

12VDC @ 3A max Dry Contact Relays

Environmental

Operating temperature: 0°-55°C
Probable
Meaning /
Cause
PS/UO
Dipswitch ID
has been
changed
Incorrect UO
programming
Communication
with PS or UO
is not stable
Response
Reset the SMPS (see User

Programming Menu

disconnect battery and mains wires, wait
for few seconds, and reconnect the battery
and mains wires.
Using the ProSYS menu, verify that the
UO functions are appropriately
programmed
The distance between ProSYS and SMPS
is too long; verify appropriate distance and
gauge of wiring (refer to Table 1: Wire
Gauge).
16
on page 13),

Hide quick links:

Publicidad

Tabla de contenido

Solución de problemas

loading

Productos relacionados para RISCO Group ProSYS 16

Este manual también es adecuado para:

Prosys 40Prosys 128

Tabla de contenido